ENGINEERING
City Engineer: Jason LaMonaco, P.E.
Assistant Engineer: Brian Doyle
Tonawanda City Hall
200 Niagara Street
Phone: (716) 695-8624
Fax: 716-743-8870
Tonawanda, New York 14150
Office Hours: 8:30 am – 4:30 PM
Mission Statement
The City of Tonawanda Engineering Department shall perform professional design, construction, and administration of improving storm and sanitary lines, roadways, bridges, and other potential projects. The Department shall use the latest in technology and engineering techniques to improve service and reduce cost. Prioritizing, planning, and building the City's infrastructure presents a constant challenge because of its age and condition. We continually strive to meet the needs of City residents, businesses, and departments by responding to information requests.
RESPONSIBILITIES
Permits
Frequently Asked Questions
Stormwater Management
CITY RIGHT-OF-WAY
- PAVEMENT
- CURBS
- SIDEWALK AND DRIVEWAY APRONS
CITY BUILDINGS AND STRUCTURES
UTILITIES/ENVIRONMENTAL
- PUMP STATIONS
- WALES AVENUE LANDFILL
- SPAULDING FIBRE
- STORMWATER MANAGEMENT
- SANITARY SEWERS
- STORM SEWERS
ADMINISTRATION
- ENGINEERING
- PLANNING
- ESTIMATING
- DESIGN
- PROJECT MANAGEMENT
- INSPECTION
ARCHIVES
- CAPITAL PROJECTS
- AERIAL PHOTOGRAPHS
REPORTING
- ANNUAL MS4 STORMWATER REPORT
- STORMWATER MANAGEMENT PROGRAM PLAN
- ANNUAL SANITARY SEWER O&M
- ANNUAL SAMPLING REPORT FOR 153 FILLMORE
- SEMI-ANNUAL GRANT STATUS REPORTS
- SEMI-ANNUAL WALES AVENUE MONITORING REPORT
- MONTHLY SANITARY SEWER MONITORING REPORT
- CENTRAL BUSINESS DISTRICT ZONING AND MASTER PLAN UPDATE
- PLANNING AND DESIGN OF REVITALIZATION PROJECTS FOR GATEWAY HARBOR AND THE NIAGARA RIVER
- GRAVITY OVERFLOW MONITORING
- 2017 SIDEWALK REPLACEMENT
- VETERAN'S PARK SUBDIVISION
- WATER TREATMENT PLANT REDEVELOPMENT
- NIAGARA RIVER STREAM BANK STABILIZATION
- SOFT ARMOR NYSDEC DEMONSTRATION PROJECT
- NIAGARA RIVER SHEET PILE REPAIR
- RAILS TO TRAILS EXTENSION
- 2018 CDBG SANITARY SEWER LINING
- PHASE 6 SANITARY SEWER SYSTEM EVALUATION FOR ORDER ON CONSENT COMPLIANCE
- ELLICOTT CREEK PUMP STATION IMPROVEMENTS
- PHASE 7 SANITARY SEWER SYSTEM EVALUATION FOR ORDER ON CONSENT COMPLIANCE
- PHASE 8 SANITARY SEWER SYSTEM EVALUATION FOR ORDER ON CONSENT COMPLIANCE
- PHASE 9 SANITARY SEWER SYSTEM EVALUATION FOR ORDER ON CONSENT COMPLIANCE
- ISLEVIEW PUMP STATION IMPROVEMENTS
- FLETCHER STREET BRIDGE REHABILITATION
- WATERFRONT DOCK EXPANSION
- NIAGARA STREET CORRIDOR STUDY
© Copyright 2014 City of Tonawanda, NY